00 / Specification
The 13-phase roadmap, isolation policy, operating modes, verification principles and approval boundaries have been documented. Formal gate sign-off was not independently checked for this site update.
Thirteen planned phases from specification to controlled self-improvement. The current build has reached Phase 3; open a phase for its scope and approval criteria.
Current implementation focus is Phase 3. Prototype tests are reported separately from formal phase approvals; nothing advances on a test count alone.
Active Phase 3 · real Sandbox run and result import pending verification
Evidence-based snapshot, not an automatic release counter. Software tests and phase approval are separate milestones.
The 13-phase roadmap, isolation policy, operating modes, verification principles and approval boundaries have been documented. Formal gate sign-off was not independently checked for this site update.
Architecture and resource probes, task-state recovery checks and iterative core packages have been exercised. A complete phase-gate audit is not available from the current project evidence.
Project/test workbench, GUI workflow, candidate export, protected-original rules and Windows Sandbox launch tooling are being integrated and tested.
13 phases
Project definition; decisions register; process diagrams; acceptance criteria; open-issues log.
The requirements are consistent enough to guide technical design, and the user explicitly approves them.
Architecture decision; tested feasibility notes; resource budget; security and dependency record.
The proposed design is supported by actual feasibility evidence, with remaining constraints stated.
Runnable core; task manager; logs and diagnostics; core reliability tests.
Tasks retain accurate state across normal operation and anticipated interruptions.
Workspace and knowledge stores; change history; restore and isolation tests.
One project cannot accidentally change another, leak its context or overwrite protected originals.
Source registry; retrieval and checker workflow; integrity tests with false or missing references.
Invented or unsupported sources are not treated as facts, and the checker’s required scope is agreed.
Project inventory; target and dependency report; inspection tests.
The system can describe a real unfamiliar project accurately enough to plan useful work.
Task planner; scheduling and approval behaviour; replanning tests.
Plans are traceable, executable within the approved scope and revised when needed.
Coding and build tools; captured artifacts and logs; representative programming examples.
Selected ordinary programming tasks can be built, run and handed over with evidence.
Test runner; diagnostic and repair process; failure records; regression results.
Failures can be reproduced, investigated and reassessed without pretending skipped tests passed.
Adapter contract; documentation; selected working adapter examples; compatibility tests.
At least one specialised workflow works through the interface without destabilising general coding.
Documented interface; asset inspection; integration test and limitation report.
A real output is requested, received, inspected and tested through a verified interface.
Integrated release candidate; end-to-end test records; operational guidance.
Representative tasks finish or fail transparently without bypassing isolation or approvals.
Improvement proposal; isolated candidate; comparison and test report; approval record.
A demonstrated improvement is reviewed before any change reaches the running system.
No matching phases. Try another search.
Documentation, implementations and real test records are reviewed at each phase gate. A successful build by itself never closes a phase.