DINOPSYS / DEVELOPMENT ROADMAP

One phase
at a time.

Thirteen planned phases from specification to controlled self-improvement. The current build has reached Phase 3; open a phase for its scope and approval criteria.

Current implementation focus is Phase 3. Prototype tests are reported separately from formal phase approvals; nothing advances on a test count alone.

PROJECT STATE ACTIVE BUILD
03 / 12

Project isolation & workbench

Active Phase 3 · real Sandbox run and result import pending verification

00010203040506070809101112
Foundation prototypes tested · formal phase-gate status not independently audited

What has actually been built?

Evidence-based snapshot, not an automatic release counter. Software tests and phase approval are separate milestones.

DOCUMENTED

00 / Specification

The 13-phase roadmap, isolation policy, operating modes, verification principles and approval boundaries have been documented. Formal gate sign-off was not independently checked for this site update.

PROTOTYPES TESTED

01–02 / Foundation

Architecture and resource probes, task-state recovery checks and iterative core packages have been exercised. A complete phase-gate audit is not available from the current project evidence.

ACTIVE DEVELOPMENT

03 / Isolation & workbench

Project/test workbench, GUI workflow, candidate export, protected-original rules and Windows Sandbox launch tooling are being integrated and tested.

Latest confirmed progress

  • Phase 3 GUI and Test Workbench were assembled; a reported test suite passed 300 simulated checks, with 5 skipped. These are not proof of a completed real Sandbox run.
  • The Windows PowerShell 5.1 ZIP-support failure was identified. The repair installer was reported complete, and the Sandbox GUI was reported opening on 14 November.
  • Next verification: launch a real Windows Sandbox test from the workbench, capture guest results, import those results and confirm the protected original remains unchanged.

Development sequence

13 phases

Definition and feasibility

00Project definitionDefine exactly what DinopSys is supposed to do.EVIDENCE

Work in this phase

  • Set the scope, success criteria and what is explicitly out of scope.
  • Record autonomy rules, the three working modes and actions that require permission.
  • Specify isolated projects, separate knowledge and evidence records.
  • Define research verification, optional Dinolab boundaries and the end-to-end task path.
  • Log unresolved design choices, risks and dependencies.

Evidence to review

Project definition; decisions register; process diagrams; acceptance criteria; open-issues log.

Condition for completion

The requirements are consistent enough to guide technical design, and the user explicitly approves them.

01Technical feasibility & architectureFind an approach that is realistic on the intended machines.EVIDENCE

Work in this phase

  • Evaluate the Windows workstation and Ubuntu backend roles without assuming a final division of work.
  • Test native inference options; keep the model backend replaceable and avoid making Ollama mandatory.
  • Measure resource limits and design workload scheduling for memory, compute and storage.
  • Specify communication, security boundaries, dependency choices and failure handling.
  • Run small feasibility experiments before committing to the architecture.

Evidence to review

Architecture decision; tested feasibility notes; resource budget; security and dependency record.

Condition for completion

The proposed design is supported by actual feasibility evidence, with remaining constraints stated.

The system underneath

02Core foundationBuild the part of DinopSys that runs and tracks work.EVIDENCE

Work in this phase

  • Create the orchestrator, task lifecycle and durable task records.
  • Implement configuration, structured logs and useful error diagnostics.
  • Connect the chosen inference backend through a replaceable interface.
  • Monitor and limit active workloads; handle backend failures and interruption.
  • Support task pause, resume, cancellation and state recovery.

Evidence to review

Runnable core; task manager; logs and diagnostics; core reliability tests.

Condition for completion

Tasks retain accurate state across normal operation and anticipated interruptions.

03Project isolation & knowledgeGive every project its own protected place to work.ACTIVE

Work in this phase

  • Create separate workspaces and isolated copies of project files.
  • Keep original projects unchanged until an explicit integration decision.
  • Store project facts separately from DinopSys system knowledge.
  • Label claims as observed, verified, inferred, unverified or rejected, with provenance.
  • Make cross-project transfers explicit; test backup, restoration and separation.

Evidence to review

Workspace and knowledge stores; change history; restore and isolation tests.

Condition for completion

One project cannot accidentally change another, leak its context or overwrite protected originals.

04Research & verification engineFind actual sources and test whether claims match them.PLANNED

Work in this phase

  • Search, retrieve and read technical sources while preserving user-supplied material.
  • Record original URLs, retrieval time, status and the content actually received.
  • Build an independent checker that searches for a cited page and compares the real passage with a claim.
  • Return separate outcomes for supported, contradicted, inaccessible and not-found evidence.
  • Apply limits to retrieval and treat page content as untrusted input.

Evidence to review

Source registry; retrieval and checker workflow; integrity tests with false or missing references.

Condition for completion

Invented or unsupported sources are not treated as facts, and the checker’s required scope is agreed.

05Project intelligenceInspect an unfamiliar project before making changes.PLANNED

Work in this phase

  • Read real files, configuration, documentation, dependencies and build instructions.
  • Detect relevant languages, frameworks, formats, tools and version constraints.
  • Identify the requested target, affected files, expected behaviour and files to preserve.
  • Record gaps and uncertainties instead of filling them with guesses.
  • Write an evidence-backed project summary into that project’s knowledge store.

Evidence to review

Project inventory; target and dependency report; inspection tests.

Condition for completion

The system can describe a real unfamiliar project accurately enough to plan useful work.

Programming and verification

06Planning & execution controlTurn a request into work that can be followed and changed.PLANNED

Work in this phase

  • Break objectives into tasks with dependencies, measurable results and known risks.
  • Choose only the capabilities needed for each task.
  • Estimate resource requirements and schedule work within limits.
  • Apply Autonomous, Supervised or Interactive checkpoints as selected.
  • Pause, cancel, resume and replan when evidence invalidates an assumption.

Evidence to review

Task planner; scheduling and approval behaviour; replanning tests.

Condition for completion

Plans are traceable, executable within the approved scope and revised when needed.

07General programming & build engineHandle ordinary software development across toolchains.PLANNED

Work in this phase

  • Create and edit source and configuration files, including multi-file changes.
  • Find suitable language runtimes, compilers and build tools with version checks.
  • Run programs, build packages and capture outputs and exit codes.
  • Respect existing project conventions and keep changes in isolated workspaces.
  • Make toolchain support extensible rather than hardcoding one environment.

Evidence to review

Coding and build tools; captured artifacts and logs; representative programming examples.

Condition for completion

Selected ordinary programming tasks can be built, run and handed over with evidence.

08Verification, testing & recoveryUse observed results to decide whether the work succeeded.PLANNED

Work in this phase

  • Run relevant unit, integration, functional and regression checks.
  • Inspect runtime results, generated files and failure logs.
  • Diagnose errors from recorded evidence, then repair the isolated copy.
  • Retry within defined limits and rerun checks affected by the repair.
  • Distinguish passed, failed, blocked and skipped tests in the report.

Evidence to review

Test runner; diagnostic and repair process; failure records; regression results.

Condition for completion

Failures can be reproduced, investigated and reassessed without pretending skipped tests passed.

09Technology & environment adaptersAdd specialised capabilities without rewriting the core.PLANNED

Work in this phase

  • Define a stable adapter interface and lifecycle.
  • Record supported versions, formats, dependencies, tools and known limitations.
  • Provide specialised inspection, execution and testing where a target requires it.
  • Research new environments and build adapters in isolation.
  • Test that new adapters do not disrupt unrelated capabilities.

Evidence to review

Adapter contract; documentation; selected working adapter examples; compatibility tests.

Condition for completion

At least one specialised workflow works through the interface without destabilising general coding.

10Dinolab integrationMake asset generation an optional external connection.PLANNED

Work in this phase

  • Learn Dinolab’s real documented capabilities instead of assuming its internals.
  • Define a request and response contract for assets and metadata.
  • Inspect received outputs and check target-specific preparation requirements.
  • Integrate and test assets in an isolated receiving project.
  • Keep ordinary DinopSys operation independent of Dinolab availability.

Evidence to review

Documented interface; asset inspection; integration test and limitation report.

Condition for completion

A real output is requested, received, inspected and tested through a verified interface.

Operation and improvement

11Complete autonomous operationConnect the pieces into an end-to-end development workflow.PLANNED

Work in this phase

  • Coordinate project inspection, research, planning, implementation and testing.
  • Route inference, build and retrieval work through shared resource management.
  • Exercise all three operating modes and approval boundaries.
  • Handle interruption, unavailable services and incomplete results.
  • Run varied end-to-end tasks and report changes, evidence and limitations.

Evidence to review

Integrated release candidate; end-to-end test records; operational guidance.

Condition for completion

Representative tasks finish or fail transparently without bypassing isolation or approvals.

12Controlled self-improvementEvaluate changes to DinopSys without granting unrestricted self-editing.PLANNED

Work in this phase

  • Use failure and performance evidence to identify improvements worth attempting.
  • Propose changes with measurable success conditions.
  • Implement the candidate in a separate copy or branch.
  • Run unit, integration, regression and safety checks against the existing version.
  • Present comparisons for review; production replacement requires explicit approval.

Evidence to review

Improvement proposal; isolated candidate; comparison and test report; approval record.

Condition for completion

A demonstrated improvement is reviewed before any change reaches the running system.

Approval is an explicit action, not an assumption.

Documentation, implementations and real test records are reviewed at each phase gate. A successful build by itself never closes a phase.