Functional
Full universal lifecycle, comprehensive mods, repositories and advanced administration pass.
Twelve planned phases for the new independent Kipvis Control, from the Go core and native host agent to advanced mod management, a qualified technical preview and multi-host expansion.
Design decisions 01–33 are recorded. No new-product implementation or completed phase gate is claimed. The old prototype remains separate.
33 decisions recorded · formal phase gate not yet verified
Release eligibility depends on demonstrated behavior, security, recovery and honest compatibility claims.
Full universal lifecycle, comprehensive mods, repositories and advanced administration pass.
Materially different server/mod mechanisms pass capability-driven qualification.
Authorization, process boundaries, journal, interruption handling and recovery pass.
Test records, known limitations, supported environments and release approval exist.
A release fails its gate if essential security or integrity tests fail—even if most of the interface works. Preview qualification is not a production-stability claim.
12 phases
—
Signed-off requirements baseline, contract diagrams and risk register.
Formal review confirms the Phase 00 architecture and verification contracts are ready for implementation.
00
API test results, state journal replay/reconciliation, authorization evidence.
Authorized, denied and interrupted operations have accurate persisted outcomes.
01
Agent privilege tests, service lifecycle traces and non-interference results.
Disposable services are managed without uncontrolled host privileges or unrelated side effects.
01, 02
Startup and file-integrity traces, capability reports, failure-path tests.
Materially different native server mechanisms complete lifecycle tests without core game branches.
01–03
UI/API/agent traces, restore tests, data integrity and permission checks.
Administration and storage workflows produce accurate state and recover safely.
01–04
Multiple mod-mechanism test records, extension denial tests, verified rollback evidence.
Comprehensive supported mod workflows pass integration, safety and recovery tests.
00–05
G1–G4 test reports, capability matrix, supported environment matrix and approval.
Qualified preview explicitly approved; any critical security or integrity failure blocks it.
01–06
Firewall and port conflict tests, diagnostic and telemetry reports.
Expanded operational features meet their declared OS/permission contracts.
01–07
Install/upgrade/failure/repair/uninstall regression evidence.
Stable release only includes capabilities meeting all applicable safety and recovery gates.
02, 07, 08
Host isolation tests, reconnect/fencing checks and verified migration.
Two or more hosts can be managed within declared permissions, without reliance on continuous dashboard connectivity.
09
Windows support matrix, native agent acceptance reports and failure results.
Windows claims match observed behavior, not assumed Linux parity.
05, 06
Independent extension build/install tests, API-version and permission tests.
Community extensions work without an official marketplace or privilege bypass.
No phases match your search. Try a different topic.
Core security, operation persistence and backup safety are prerequisites—not optional polish at the end.
Decisions and test criteria
API, identity and journal
Controlled host execution
Generic install and adoption
Protected files and extensions
G1–G4 evidence and approval
Phases may overlap, but later state-changing operations cannot bypass earlier security or recovery prerequisites.